DuraTrax Rx Battery Box 4-Cell w/Long Lead DTXM3000

DuraTrax

Item # DTXM3000
$5.99
Status: In Stock
Fits Model:
DuraTrax Street Force GP2
Fits Model:
DuraTrax Nitro Evader ST
Fits Model:
DuraTrax Nitro Evader BX
UPC:
753600430004
DuraTrax Rx Battery Box 4-Cell w/Long Lead DTXM3000

More information about DuraTrax Rx Battery Box 4-Cell w/Long Lead DTXM3000

This is the 4-cell receiver battery box for the DuraTrax Street Force GP2 and the Nitro Evader ST and BX.

Features: Constructed of plastic, holds four AA cells

Includes: One 4-Cell Battery Holder

Requires: Installing batteries, and connecting to receiver

Note: Works in any R/C vehicle needing a 4 cell battery holder